We converted an existing two-story, tilt-up office building into a state-of-the-art blood donor center and research laboratory. In addition, an upgrade to the electrical system was needed, including a 400 kW emergency generator, in order to support the increased electrical load. A large section of labs included fully adjustable and modularized casework to allow the end users the flexibility of adjusting the casework as required.